澳洲矿企Aureka在维多利亚州Comstock金矿项目的Walkers Shear构造中首次拦截到可见金[1]。该发现位于浅层区域,其中一处钻孔在距地表仅18米处的21.7米深度发现可见金粒,同一钻孔在61.2米深处的石英脉中又拦截到13粒可见金[1]。
公司管理董事James Gurry表示:"我很高兴看到Comstock再次交出成绩,这次在我们首次生产的目标坑内至少发现两处可见金"[1]。2025年迄今,Aureka已在Comstock钻进7个金刚石钻孔,其中6个获得显著金银结果[1]。岩心样本的化验结果预计在3至5周内出现[1]。该项目目前拥有56,500盎司的金矿资源[1],公司已与邻近的Wedderburn金矿厂签署固定冶炼伙伴协议,支撑其启动小规模生产的战略[1]。
Australian mining company Aureka has made a significant discovery of visible gold within the Walkers Shear structure at its Comstock gold project in Victoria's St Arnaud district [1]. A single diamond drill hole intercepted multiple visible gold grains at shallow depths, with one intersection containing visible gold at 21.7 metres below surface—just 18 metres from the ground level—and another strike yielding 13 visible gold particles at 61.2 metres depth within a quartz vein [1].
The discovery expands Aureka's understanding of near-surface mineralization potential at the Comstock project, which hosts an estimated 56,500 ounces of gold [1]. Of seven diamond drill holes completed at Comstock during 2025, six have returned significant gold and silver results [1]. Managing Director James Gurry stated: "I am very pleased to see Comstock deliver again, with at least two visible gold occurrences identified within our first production target pit" [1]. Core samples from the latest drilling are expected to return assay results within three to five weeks [1]. The company has also entered into a fixed toll milling partnership agreement with the adjacent Wedderburn gold processing facility, positioning itself to pursue a small-scale production strategy [1].