尼泊尔错坚河汇入西藏普热普强藏布交汇处出现堰塞湖,截至8月27日上午估算水量已达200万立方公尺,且处于漫溢状态 1。预计未来3天还有300万立方公尺的水入湖,溃泄风险高 1。中国水利部正密切监视并进行演算分析,消除上游堰塞湖风险是当前抢险首要任务 1。
中国安能工程救援队拉萨基地8人先遣组已于凌晨抵达西藏吉隆镇开展测绘监测 1。中国安能310名救援人员及120台(套)大型抢险装备预计下午陆续抵达灾区 1。
A barrier lake has formed at the confluence of the Cuojian River in Nepal and the Purepu Qiangzangbu River in Tibet, with the water volume reaching an estimated 2 million cubic meters as of the morning and currently overflowing 1. An additional 3 million cubic meters of water are expected to flow into the lake over the next three days, creating a high risk of a breach 1. The Ministry of Water Resources of China is closely monitoring the situation and conducting calculation analyses, noting that eliminating the risk posed by the upstream barrier lake is the primary task of the current rescue operations 1.
To address the emergency, an eight-member advance team from the Lhasa base of the China Anneng Engineering Rescue Team arrived in Gyirong Town, Tibet, in the early morning to conduct surveying and monitoring 1. Additionally, 310 rescue personnel and 120 sets of large-scale rescue equipment are expected to arrive in the disaster area one after another in the afternoon 1.
评论
还没有评论,欢迎留下第一条。