黄金生产商Kaiser Reef在维多利亚州Maldon金矿项目完成了一项覆盖59平方公里、线距35米的高分辨率空中磁测量调查1。这次采用直升机支持的磁性和放射测量旨在结合近期土壤取样数据,为下一批钻探目标定位1。
Maldon金矿位于维多利亚州黄金三角地带,历史产出175万盎司黄金1。该项目长期被现代勘探者忽视1。Kaiser Reef董事总经理Brad Valiukas表示:"我们在土壤中看到一些偏离北南向的金趋势,期待直升机地球物理测量确认和更好地定义与多条北南向矿脉相交的穿切构造"1。
公司在Maldon已识别多个钻探目标。Union Hill矿床推断资源为131万吨,品位4.44克/吨,含18.7万盎司黄金1。Quill目标表现突出,八米取芯品位达4.16克/吨(钻芯自10米深度)1。当前进行的4350米表面钻探计划涉及四个初始目标1。
Kaiser Reef总矿产资源为542万吨,品位3.59克/吨,含62.5万盎司1。公司Porcupine Flats加工厂已取证营运,年处理能力20万吨1。2027财年产量指导目标为32000盎司,来自Maldon和Henty两个项目1。
Gold producer Kaiser Reef has completed a high-resolution airborne magnetic survey covering 59 square kilometers of its Maldon gold project in Victoria's Golden Triangle, employing helicopter-supported magnetic and radiometric measurements with 35-meter line spacing.1 The survey is designed to work in conjunction with recent soil sampling data to identify drill targets for the next phase of exploration.1
The Maldon goldfield has a historical production record of 1.75 million ounces and a grade of 28 grams per tonne, though it has been largely overlooked by modern explorers.1 Kaiser's total mineral resource across the project stands at 5.42 million tonnes grading 3.59 grams per tonne, containing 625,000 ounces.1 The Union Hill deposit alone holds an inferred resource of 1.31 million tonnes at 4.44 grams per tonne, representing 187,000 ounces.1
Brad Valiukas, Kaiser Reef's managing director, noted that the company has identified gold trends in soil samples that deviate from north-south orientation, and the helicopter geophysical survey is expected to confirm and better define cross-cutting structures intersecting multiple north-south-oriented veins.1 The company is currently undertaking a 4,350-meter surface drilling program targeting four initial sites.1 Notable among exploration results is the Quill target, which delivered an eight-meter core interval grading 4.16 grams per tonne from 10 meters depth.1
The Porcupine Flats processing plant has been licensed for operation with an annual capacity of 200,000 tonnes.1 Kaiser has guided production of 32,000 ounces for the 2027 financial year from both the Maldon and Henty projects.1
评论
还没有评论,欢迎留下第一条。