澳大利亚矿业公司Red Metal已启动其Sybella稀土项目的前期可行性研究[1]。该项目位于昆士兰州西北部Mount Isa以南20公里处,拥有全球重要的大规模稀土矿床[1]。根据JORC认证,该项目的勘探目标为24亿至49亿吨[1]。
Red Metal已聘请DRA Global、AMDAD和The Core Group三家昆士兰咨询公司参与此次研究[1],这些机构将负责采矿和加工工艺的设计、成本评估和优化工作[1]。前期可行性研究将以年处理2000万吨矿石为基础情景进行建模,同时还将评估年处理1000万吨或2500万吨的可缩放方案[1]。该研究预计将于今年年底或明年初完成[1]。
Australian mining company Red Metal has initiated a pre-feasibility study for its Sybella rare earths project, located 20 kilometers south of Mount Isa in northwestern Queensland.[1] The project contains a globally significant large-scale rare earth deposit with a JORC-compliant exploration target ranging from 2.4 to 4.9 billion tonnes.[1]
Red Metal has engaged three Queensland-based consulting firms—DRA Global, AMDAD, and The Core Group—to conduct the study, focusing on mining and processing methodology design, cost assessment, and optimization.[1] The pre-feasibility study will model a base-case throughput of 20 million tonnes of ore annually, with the flexibility to scale operations down to 10 million tonnes or up to 25 million tonnes per year.[1] The company anticipates results from the study by the end of this year or early next year.[1]