Gateway Mining公司已在西澳大利亚Yandal项目的Cowza金矿发现处启动第二台反循环钻机,标志着其勘探活动的升级[1]。首席执行官Richard Pugh表示,"第二台钻机的启动标志着Gateway进入勘探的新阶段"[1]。该项目位于Wiluna东北方向85公里处[1]。
近期的勘探工作已确认了一条3.5公里长的高品位金矿走廊[1]。其中包含的显著矿样包括自72米深处的4米品位11.1克/吨黄金、自76米深处的8米品位3.1克/吨黄金,以及自80米深处的4米品位3.3克/吨黄金[1]。
Gateway目前在Yandal项目拥有8.17百万吨、品位1.52克/吨黄金的JORC资源量,合计400,400盎司[1]。公司财务状况稳健,现金及流动证券总额超过2,100万澳元,其中包括现金1,570万澳元和流动ASX证券560万澳元[1]。
Gateway Mining has commenced operations with a second reverse circulation drill at its Cowza gold discovery within the Yandal project in Western Australia, signaling an escalation of exploration efforts at the site [1]. The deployment marks what the company describes as a new phase in its exploration campaign, as Gateway Chief Executive Richard Pugh stated: "The mobilisation of the second rig represents Gateway entering a new phase of exploration" [1].
The expanded drilling program follows the company's recent confirmation of a 3.5-kilometre-long high-grade gold corridor at Cowza [1]. Significant assay results from this zone include a 4-metre interval grading 11.1 grams per tonne gold from 72 metres depth, an 8-metre intersection grading 3.1 grams per tonne from 76 metres, and a 4-metre section grading 3.3 grams per tonne from 80 metres [1]. The Yandal project, located 85 kilometres northeast of Wiluna, currently hosts a JORC resource of 8.17 million tonnes at 1.52 grams per tonne, totalling 400,400 ounces [1]. Gateway maintains a cash position exceeding AUD 21 million, comprising AUD 15.7 million in cash and AUD 5.6 million in liquid ASX-listed securities [1].