阔别多年的中蒙俄国际旅客列车于11月25日正式恢复开行,车次定为V3/4次,采取每周往返的模式运行 1。此次复开对线路进行了显著调整,终点站由莫斯科变更为俄罗斯伊尔库茨克,全程距离从7800公里缩减至2666公里,预计运行时间约为55小时 1。具体时刻安排上,北京至伊尔库茨克方向的V3次列车定于每周三上午7时27分从北京站始发,并于周五下午14时55分抵达伊尔库茨克站 1。
在硬件设施与服务体验方面,新启用的列车全面升级为25G型空调车底,彻底摒弃了传统的燃煤取暖方式 1。车厢内部配置得到优化,除了提供硬卧席位外,还设有配备独立卫生间和淋浴设施的高级软卧包厢 1。为了保障跨境旅行的舒适度与便利性,中国餐车将随列车一同出境,提供中餐、西餐等多种选择,铁路部门同时配备了随车翻译以协助解决语言沟通问题 1。沿途站点涵盖蒙古国的扎门乌德、乌兰巴托,以及俄罗斯的纳乌什基和位于贝加尔湖畔的斯柳江卡等地 1。
此次车次变更依据的是2026版《列车车次编排规定》,其中普速列车号段统一并入“V”字头,具有历史延续性的原K3/4次列车因此更名为V3/4次 1。这一调整也是北京站实施全国首批普速列车车次变更的一部分,涉及共计110列列车的名称调整 1。目前,相关车票已通过线下渠道开始发售 1。
The long-dormant China-Mongolia-Russia international passenger train service, designated as the V3/4 pair, resumed operations on November 25 1. The route connects Beijing to Ulaanbaatar and terminates in Irkutsk, Russia 1. Under the new schedule, the train operates weekly, with the northbound V3 service departing Beijing Station at 7:27 AM every Wednesday and arriving at Irkutsk Station at 2:45 PM on Fridays 1. This revival aims to facilitate personnel exchanges and economic trade cooperation among the three nations, with tickets currently available for purchase through offline channels 1.
A major operational change involves the route's termination point shifting from Moscow to Irkutsk, reducing the total journey distance from 7,800 kilometers to 2,666 kilometers and cutting travel time to approximately 55 hours 1. The train traverses key stops including Zamyn-Üüd and Ulaanbaatar in Mongolia, and Naushki and Slyudyanka near Lake Baikal in Russia 1. In terms of rolling stock, the service has been upgraded to use fully air-conditioned 25G-type carriages, eliminating coal-burning heating systems found in previous iterations 1. Enhanced comfort features include premium soft sleeper compartments equipped with private bathrooms and shower facilities 1. To address language barriers and dining needs, the train provides onboard translation services and carries Chinese dining cars across borders, offering both Chinese and Western cuisines 1. These changes coincide with a broader railway reorganization where the K3/4 historical designation was updated to V3/4 under the 2026 edition of the "Train Numbering Regulations" 1. Beijing Station also implemented a nationwide adjustment affecting 110 regular-speed trains as part of this numbering update 1.
评论
还没有评论,欢迎留下第一条。