美国陆军取消了一项更清洁的化学处理合同,决定对位于爱荷华州法特麦迪逊(Fort Madison)的5吨用于制造炸弹的含铅材料进行受控引爆 12。该计划涉及的物质为叠氮化铅,军方此前拒绝了替代性的销毁选项,这一决定引发了当地居民对有毒铅尘扩散及健康风险的担忧 123。尽管面临法律挑战,司法部文件显示陆军仍计划在11月24日前执行该行动,而当地官员指出引爆可能发生在周一或周二 123。
联邦法官已暂停陆军的引爆计划,并要求环保署(EPA)在周日中午前作出回应 1。然而,根据最新报道,美国陆军计划援引紧急条款以推进引爆作业,即便此前设定的法律挑战截止日期已过 23。目前,地方政府和环保团体质疑该行动的法律地位及环境影响,但军方坚持推进受控引爆,若未获进一步司法阻止,行动可能在周末期限后随即展开 123。
The U.S. Army intends to proceed with the controlled detonation of five tons of lead azide, a toxic explosive used in bomb manufacturing, in Fort Madison, Iowa 12. Although a federal judge previously paused the planned explosion, the military has decided to invoke emergency provisions to carry out the operation, with Department of Justice filings indicating an execution deadline of November 24 23. Local authorities have stated that if no further legal blocks are issued, the detonation could occur as early as Monday or Tuesday 123.
This decision follows reports that the Army cancelled a contract for a cleaner chemical treatment method in favor of blasting the materials, a move that has sparked significant concern among residents and environmental groups regarding potential exposure to toxic lead dust 123. A federal court had set a noon Sunday deadline for the Environmental Protection Agency (EPA) to respond to administrative stays challenging the plan, but this deadline has passed without halting the military's efforts 13. Critics argue that the legal status of the emergency invocation remains uncertain, while the Army maintains its commitment to the scheduled destruction of the hazardous waste 3.
评论
还没有评论,欢迎留下第一条。