位于苏格兰马瑟韦尔的 Liberty Steel Dalzell 工厂目前深陷财务危机,引发了外界对其能否按时为英国皇家海军三艘舰队综合支援舰(FSS)提供钢板的担忧 1。该工厂是唯一能生产所需钢板的英国设施,但因缺乏流动资金导致产量受限,且面临工资拖欠和清算请愿等危机 1。尽管政府表示正在密切监控并鼓励使用英国供应商,但西班牙造船商 Navantia 可能因供应问题将钢材采购转向海外,威胁到北爱尔兰哈兰德与沃尔夫造船厂的复兴计划及国防供应链安全 1。
此次危机涉及由西班牙国有造船商 Navantia 在北爱尔兰贝尔法斯特承建的合同,合同价值 16 亿英镑 1。Liberty Steel Dalzell 获得订单,负责生产用于建造这些舰艇的 34,000 吨金属板 1。其中第一艘 FSS 舰艇计划于 2031 年交付,船体长 216 米 1。
Liberty Steel 的控制方 Gupta Family Group (GFG) Alliance 正经历动荡,其创始人 Sanjeev Gupta 的主要贷款方 Greensill Capital 已于 2021 年倒闭,GFG 旗下公司目前正接受英国严重欺诈办公室 (SFO) 调查 1。此前,国家能源系统运营商 (Neso) 曾对 Liberty Steel Dalzell 提出清盘呈请,后因债务偿还而撤回 1。此外,Aviva 养老金提供商已暂停接收该工作场所养老金计划的进一步供款 1。近期,Dalzell 工厂尝试从哈萨克斯坦进口钢材进行少量生产,但该材料不适合国防合同要求 1。Community 工会秘书长 Alasdair McDiarmid 警告称:“如果 Liberty 现在无法生产,政府干预的理由将不可避免。” 1
Liberty Steel Dalzell, the sole UK facility capable of producing the specific steel plates required for three Royal Navy Fleet Solid Support (FSS) ships, is facing severe financial instability that jeopardizes its ability to deliver 34,000 tonnes of metal under contract 1. The FSS vessels are being constructed by Spanish state-owned shipbuilder Navantia in Belfast as part of a £1.6bn deal, with the first ship scheduled for delivery in 2031 and featuring a hull length of 216 meters 1. This production bottleneck raises critical concerns about the resilience of the national defense supply chain and the viability of the Harland & Wolff shipyard’s revival plans in Northern Ireland, as Navantia may be forced to source materials from overseas due to the supplier's liquidity crisis 1.
The operational difficulties at the Motherwell-based plant stem from broader governance issues within its parent company, Liberty Steel, which is controlled by the Gupta Family Group Alliance (GFGA) 1. GFGA founder Sanjeev Gupta’s primary lender, Greensill Capital, collapsed in 2021, and companies under the GFGA umbrella are currently subject to an investigation by the UK Serious Fraud Office (SFO) 1. At the factory level, cash flow shortages have restricted output, leading to wage arrears and a recent petition to wind up the business by National Grid Electricity System Operator (Neso), although this petition was withdrawn after debts were repaid 1. Additionally, Aviva, the pension provider for the site, has suspended further contributions to the workplace pension scheme 1.
Recent attempts by Dalzell to import steel from Kazakhstan for limited production proved insufficient, as the imported material does not meet the technical specifications required for defense contracts 1. In response to the unfolding crisis, the UK government has stated that it is closely monitoring the situation while encouraging the use of domestic suppliers 1. Alasdair McDiarmid, General Secretary of the Community union, warned that if Liberty cannot maintain production capabilities, "the case for government intervention will become inevitable" 1.
评论
还没有评论,欢迎留下第一条。