新南威尔士州总理克里斯·明斯宣布,期待已久的悉尼地铁西南延伸线将于10月30日正式开通1。这条延伸线连接班克斯镇至城市地铁网络的10个车站,将结束超过两年的公交车替代服务1。首班车定于上午4:31发出1,届时班克斯镇至中央站的行程时间将从原有的34分钟缩短至28分钟1。
西南延伸线完成后,悉尼地铁将形成从西北部塔拉翁贡至西南部班克斯镇的66公里连续地铁线1。新路段包括马瑞克维尔、德尔威奇山、赫尔斯通公园、坎特伯雷、坎普西、贝尔莫尔、拉基巴、怀利公园、潘奇鲍尔和班克斯镇等车站1。高峰时段该线路容量将增加17,000人1,服务频率设定为高峰期每4分钟一班,白天每5分钟,晚间及周末每10分钟1。明斯评价这一时刻为"对西南悉尼是个巨大时刻"1。城市及西南地铁项目的总成本超过200亿澳元1,替代巴士服务将在10月30日及首个周末后停运1。
New South Wales Premier Chris Minns has announced that the long-awaited southwest extension of Sydney's metro will commence operations on Friday, October 30, marking the end of more than two years of replacement bus services 1. The expansion will connect ten new stations from Bankstown to the city's metro network, creating a continuous 66-kilometre line stretching from Tallawong in the northwest to Bankstown in the southwest 1.
The new stations include Marrickville, Dulwich Hill, Hurlstone Park, Canterbury, Campsie, Belmore, Lakemba, Wiley Park, Punchbowl, and Bankstown 1. The first train is scheduled to depart at 4:31 a.m. 1. The extension will reduce travel time from Bankstown to Central Station to 28 minutes, saving six minutes compared to the previous heavy rail service 1. During peak hours, the line will operate every four minutes, with five-minute intervals during the day and ten-minute intervals in the evening and on weekends 1.
Minns characterised the opening as "a huge moment" for southwest Sydney 1. The combined cost of the city and southwest metro projects exceeds 20 billion Australian dollars 1. The replacement bus service will continue until October 30 and through the first weekend 1.
评论
还没有评论,欢迎留下第一条。